PROTON Thermal Power Plant (Warhead Update)

PROTON Thermal Power Plant (Warhead Update)

By Team Fire Productions Published 6 Aug 2023 · Updated 11 Mar 2024
4.7

Welcome to the best power plant facility on MCPE. PROTON Thermal Power Plant features a FULLY FUNCTIONAL reactor core, as well as fully functioning coolant and exhaust systems. Outside of the reactor core, the facility also specializes in experimental technology such as portals, warheads and 4 independent laboratories. There is so much to explore in this incredibly polished, detailed and fully functional facility. Join today to celebrate Team Fire's return to MCPE maps after a year of absence.

Select version for changelog:

Changelog
  • Warhead update (v1.1) released!
  • Warhead event now triggers randomly.
  • You must disarm the warhead using the hardwire shutdown.
  • New updates coming soon.

Installation

Installation Guides

1
Add facility control room where you can put the self destruct
1
Where is the Self-destruct system?
1
I did figure out how to fix the portal technology door. All you need to do is add a repeater, as the redstone signal is not long enough :)
1
A few things. Door to portal technology is broken, along with the warhead room. Boundry key non existent. But all-in-all, great map! I love it so much! Could you by any chance add a security room in future updates? Awesome job!
1
Good Map but sadly Harrys Phone-Number is not available (I love the Easter Eggs)
1
you just get stuck with the link
1
pls update